Stop letting bad pre-construction cost you $10,000+ in execution corrections.

A licensed NC GC structures your entire project before the cracks split the deal — bid coordination, scope alignment, permit prep, contractor sourcing, draw planning. Eliminate the chaos that costs investors $10K+ mid-build. Performance guarantee: full refund if we cannot perform setup at our standard. NC GC #107724.

Pricing

$3,500 one-time

Turnaround

One-time engagement · ~5-day intake, then your project is launched into Active Oversight

One-time pre-construction setup engagement · gets your project shovel-ready, then step into Active Oversight for the build · your Bid-Ready Deal Pack fee credits forward

PERFORMANCE GUARANTEENC GC #107724

If we cannot perform the Project Setup at our standard, full refund.

See the full guarantee terms below ↓

Performance Guarantee

Refund if we cannot perform

Southern Cities' call after intake. Once we accept, we deliver.

Credits Forward

Effectively $0 if you continue

Fee credits against any deeper engagement.

Licensed NC GC

NC GC License #107724

Real contractor, real liability — not a coach or course.

Our Promise

Eliminate the chaos that costs investors $10,000+ mid-build. We structure your entire project end-to-end — subs, bids, scope, permits, schedule, draws — before the cracks split the deal.

PERFORMANCE GUARANTEENC GC #107724

Performance guarantee: full refund if after our 5-day intake we determine we cannot deliver project setup at our standard for your scope. The refund trigger is Southern Cities’ call, not the buyer’s.

The refund trigger is Southern Cities' call, not the buyer's — you are paying for our commitment to deliver, not gambling on outcomes.

The Project Setup answers

"How do I properly organize and structure this project before construction begins?"

This is pre-construction setup + management infrastructure. The goal is to remove ambiguity and chaos before any subcontractor touches the property, then hand a launched project to Active Oversight.

Why it's a no-brainer

The math.

  • 1A one-time $3,500 to get the entire project organized and launched — and your Bid-Ready Deal Pack fee credits forward, lowering the net.
  • 2Skip 40–60 hours of contractor sourcing, bid normalization, scope writing, and schedule building yourself.
  • 3A botched pre-construction setup typically costs $10K+ in execution corrections downstream.
  • 4First-prevented setup miss ROI: 4x–12x.

Bonuses stacked on top

What you also get.

  • +

    Full vendor lineup with negotiated rate cards

    irreplaceable

  • +

    Permit submission package — Southern Cities drafts, you submit

  • +

    Draw sequencing logic written for your lender

  • +

    Your Bid-Ready Deal Pack fee credited automatically

    $599 value

What it IS

  • Pre-construction execution infrastructure
  • Operational organization
  • Coordination layer

What it IS NOT

  • Active project management
  • Daily site supervision
  • Construction execution

What you actually get

Deliverables

  • 1Subcontractor fit analysis (matching project complexity to labor capability)
  • 2Contractor sourcing from the Southern Cities vetted network
  • 3Bid coordination (organizing + normalizing bids against the same scope)
  • 4Scope alignment so contractors price identical assumptions
  • 5Permit coordination
  • 6Schedule setup
  • 7Draw planning (lender draw sequencing + cash flow logic)
  • 8Procurement coordination

Scope & the line we don't cross

Billed as a one-time $3,500 pre-construction setup fee. It gets the project fully organized, ready, and launched — then rolls into Active Oversight for the build.

Project Setup & Pre-Construction Management — sample report cover
Sample

See it before you buy

A real example of the Project Setup you receive.

Don't take our word for it — open an anonymized 8-page sample of the actual branded report, with a real go / renegotiate / walk recommendation, dollarized risks, and the budget range. This is exactly what lands in your inbox.

Open the sample report (PDF) ↗

After the Project Setup

The project is set up cleanly. Now: how do you keep execution from drifting once construction actually starts?

Next step

Active Project Oversight

We become your project manager. You keep the permits, the funding, and the upside — a licensed NC GC runs the execution layer so the job moves without you managing it.

From $6,500 — scoped per project·Engagement spans active construction (typical 6 weeks–12 months by tier)
See the Active Oversight

Start the Project Setup.

A licensed NC GC structures your entire project before the cracks split the deal — bid coordination, scope alignment, permit prep, contractor sourcing, draw planning. Eliminate the chaos that costs investors $10K+ mid-build. Performance guarantee: full refund if we cannot perform setup at our standard. NC GC #107724.